[From left] Councillors Malcolm Self, Hilary Gander and John Ayles inspecting the junction
The resurfacing work carried out at Mandeville Drive on 31st March has been left in an unsatisfactory state, with the new surface ending well short of the end of Mandeville Drive and the junction with Oaks Way and Saffron Way.
The junction itself is in a very poor condition and needs resurfacing.
In addition, repeated requests for the footways, also in a very poor state, to be resurfaced, have been ignored.
Sign the petition
I request that the following highways works are carried out in Mandeville Drive as a matter of urgency.
-
Resurface the end of Mandeville Drive, including the whole of the three-way junction with Saffron Way and Oaks Way and up to the borough boundary in Oaks Way.
-
Resurface the footways.